People buy reports they can see. This is a walk-through of the format we deliver — the charts, the findings and the recommendations. The data below is illustrative, not a real client.
Voltage, frequency and flicker were within BS EN 50160 limits throughout. However, the 5th harmonic exceeded the G5/5 planning level at the main incomer, driven by variable speed drives on the HVAC plant, and the displacement power factor averaged 0.82 — attracting avoidable reactive-power charges. Twelve short voltage dips were recorded, correlating with the reported control-system resets. Targeted harmonic filtering, power factor correction and load segregation are recommended, with an estimated payback under two years.
| Parameter | Result | Limit / reference | Status |
|---|---|---|---|
| Supply voltage | Within ±10% | BS EN 50160 | Pass |
| Frequency | 49.9–50.1 Hz | BS EN 50160 | Pass |
| Flicker (Plt) | 0.8 | ≤ 1.0 | Pass |
| 5th harmonic voltage | 6.4% | G5/5 planning level | Exceeded |
| Voltage dips | 12 events | Correlated with resets | Investigate |
| Displacement power factor | 0.82 | Target ≥ 0.95 | Improve |
| Phase unbalance | 2.1% | ≤ 2% | Marginal |
All figures on this page are illustrative and do not represent a specific client site.
Fixed-price surveys, Class A instruments, recommendations you can act on.
Book a power quality survey