A fixed wiring installation degrades quietly — behind sockets, in loft voids, inside consumer units. We inspect, test and code every circuit against BS 7671, then fix what the report flags, on a schedule matched to your property type.
Most people have never seen an EICR carried out. Here is every stage of the process, so there are no surprises on the day.
Pick a live slot or request a quote for larger sites.
A qualified inspector attends with calibrated test equipment.
Every circuit tested — continuity, insulation, loop impedance, RCDs.
Boards, accessories and any defects photographed and tagged.
Readings and images checked against BS 7671 to flag anomalies.
A competent person confirms and signs off every observation.
Your coded report, delivered digitally with a remedial quote.
C1/C2 items fixed — on the day where possible, or scheduled.
Retest and a satisfactory EICR once defects are cleared.
We track the expiry and remind you before the next is due.
Compliance work handled at scale, with the accreditation and turnaround to match.
Every inspection, code and remedial repair is carried out and certified against the specific standard your property type is held to.
The IET's national wiring standard — every EICR is inspected and coded against its requirements.
Requires a valid EICR at every private rented property in England, renewed at least every 5 years.
Electrical hazards form part of the statutory risk assessment local authorities use to assess rented homes.
Requires fixed electrical systems in any workplace to be maintained to prevent danger.
Deteriorating fixed wiring is a recognised fire risk — EICR findings feed directly into your fire risk assessment.
Certain remedial electrical work identified in an EICR must be notified under Part P before completion.
BS 7671 sets a strict coding system for anything an inspection finds. Open each code below to see what it means, typical examples, and the action required.
Immediate — made safe on site the same day. The installation is unsafe to use until resolved.
Urgent repair without delay, followed by a retest before the installation is confirmed satisfactory.
Not a failure — an EICR can still be satisfactory with C3s. Worth addressing to bring the installation up to current standards.
Investigate without delay. An FI makes a report unsatisfactory until the underlying issue is resolved.
The right interval depends on how the installation is used and by whom — we scope to the sector, not a generic minimum.
Recommended interval, or at change of occupancy
Mandatory under the Electrical Safety Standards (PRS) Regs 2020
Mandatory, tied to licence renewal in most boroughs
Communal installation plus individual flat inspections
Interval confirmed by risk assessment, typically 5 years
Shorter interval given fire load and equipment duty
Kitchens and workshops inspected on the shorter end
High-risk locations inspected annually per HTM guidance
Guest areas and kitchens on a shorter cycle than back-of-house
Full-block inspection tied to academic year scheduling
A Polarity EICR is a consultancy-grade report, not a bare certificate — everything you need to understand, budget and act on your installation.
A walk-through of the report format — the certificate, schedules, evidence and remedial proof. The samples below are illustrative of the layout, not real client data.
Property, client and inspection details.
Every finding, coded C1–C3 / FI.
Test results for every circuit.
Hotspots located under load.
Each defect photographed and coded.
Documented evidence of the fix.
Issued once all defects are cleared.
Illustrative samples of the report format — not real client data.
Fixed installations age in decades, not years. Pick the level of cover that matches how much of that lifecycle you want us to manage.
A valid EICR on a fixed interval, coded and certified against BS 7671.
Best for owners and landlords who simply need compliant certification.
Inspection plus C1 and C2 remedial work carried out as part of the same visit.
Best for landlords who want dangerous defects dealt with immediately.
Inspection, remedial work and consumer unit or partial rewire at end-of-life, built in and amortised.
Best for long-term budgeting — replacing ageing consumer units and planning rewires over time.
Scoped to your circuit count, distribution board count and site count.
An EICR is one moment in a property's life. We manage the whole loop, so nothing lapses and every certificate is on record.
A new asset enters your portfolio.
Baseline inspection and coding to BS 7671.
C1/C2 defects cleared and retested.
Satisfactory EICR on your compliance record.
Interim checks keep the installation healthy.
We flag the expiry well before the deadline.
The cycle repeats, on your schedule.
Every report archived and searchable, for life.
A representative sample of recent work. Full case studies and references available on request.
Full periodic inspection ahead of tenancy renewal, one C2 finding on a damaged socket resolved same visit.
EICR identified an ageing rewireable-fuse board; replaced with a fully RCBO-protected consumer unit.
Full circuit inspection across three floors and the main distribution board.
Inspection across racking power, loading bay circuits and the main switchgear room.
Higher-risk kitchen and design-technology workshop circuits inspected ahead of a new term.
Full annual inspection across a 40-bed residential facility, one C1 made safe on the day.
Guest rooms, corridors and commercial kitchen circuits inspected on a shortened interval.
Communal riser and landlord supply inspection plus individual flat entrance circuit checks.
Full block inspection ahead of the academic year, distribution boards and room circuits tested throughout.
Representative examples — site names withheld for client confidentiality. Ask for references relevant to your sector.
Accredited EICR inspectors across Dartford and Kent, with every report logged to your compliance record wherever your properties are.
Care packages above are cheaper over time — but every service is also available as a one-off, fixed price upfront.
| Service | Standard | From |
|---|---|---|
| Inspection | ||
| EICR — 1-2 bed flat/house (up to 10 circuits) | BS 7671 | £180 |
| EICR — 3-4 bed house (up to 15 circuits) | BS 7671 | £249 |
| EICR — HMO (per habitable room) | BS 7671 | £30 |
| EICR — commercial (per distribution board) | BS 7671 | £249 |
| Remedial Work | ||
| C1 — made safe (per item, same visit) | BS 7671 | £55 |
| C2 — remedial repair (per item) | BS 7671 | £75 |
| C3 — improvement work (per item) | BS 7671 | £45 |
| Retest & satisfactory certificate issue | BS 7671 | £85 |
| Replacement & Rewire | ||
| Consumer unit replacement (RCBO board) | BS 7671 | £495 |
| Partial rewire (single circuit) | BS 7671 | £320 |
| Full property rewire (2-3 bed) | BS 7671 | £3,600 |
| Commercial rewire (per distribution board) | BS 7671 | Custom quote |
Domestic and single-property jobs — book a live slot instantly. HMO, commercial and portfolio work — send an enquiry and we'll come back with a fixed quote.
Real-time availability via our booking system. Opens in a new tab.
If the calendar above doesn't load, open live booking in a new tab →
Sent securely to our team — no email app required.
We reply within one working day. For anything urgent, call 0203 908 4790.
Private rented properties in England need a valid EICR at least every 5 years under the Electrical Safety Standards (PRS) Regulations 2020. Owner-occupied homes have no legal requirement but a 10-year interval is generally recommended; higher-risk sectors like healthcare are inspected annually.
An unsatisfactory result means at least one C1, C2 or FI code was recorded. C1 items are made safe immediately where possible; C2 and FI items need remedial work and a retest before the installation is confirmed satisfactory.
Only C1 and C2 codes (and unresolved FI items) create a legal obligation to act. C3 items are recommendations for improvement, not a failure, though many landlords choose to address them at the same visit.
No — an EICR reports on the condition of an existing installation. Part P certification applies to new notifiable electrical work, which may follow from remedial items an EICR identifies.